Tuesday, September 18, 2012

Productivity (IME)


Meaning
Production vs Productivity
NPC
Measurement
External Factors affecting
ØResources  and mobility
ØCapital
ØTaxation
ØGov laws
ØCompetition
ØTraining facility

Internal Factor
ØLayout
ØMaterial handling
ØDesign
ØWork study
ØMachinery and equipment
ØQC
ØManagement tech
Reasons...
Wastage
Break down
Waiting
Poor management
Poor working conditions
Political effects
Confusion
Shortage of material
Complication
Knowledge

Role of Engineer
Incentive
Relation
Cost calculation
Training
New technique
Planning and scheduling
Design
Management
Simplification

Advantage of Best Productivity

Profit
Wastage
Customer
Country revenue
Export
Sales
Other




Friday, September 7, 2012

Revised syllabus for IME (2nd exam-5th sem)


Bar Chart
Gantt chart
CPM
Network Analysis
PERT
JOhnson method for sequence for 2,3 or 4 machines and (n) processes


Self study topics:

process selection
machine selection
line balancing and its numericals

Second Internal Exam


Tuesday, September 4, 2012

New Assignment 1 , for Sem 5 studnets who has not submitted the older one

Each and every Numerical of Assignment 1 along with 9 Problems of Impact of jet from Patel and Patel Book(unsolved)

Last Date:20-09-2012


Fluid Mechanics 3rd sem (II internal exam)




1.       Boundary layer flow
2.       Different boundary layer and thickness
3.       Cavitation
4.        Viscous Flow
5.       Viscous flow through pipe/two steady plates/one fixed and one moving plate.
6.       Different velocity ratio of viscous flow
7.       Laminar and turbulent flow
8.       Reynold’s experiment
9.       Friction losses in flow
10.   Compressible flow
11.   Mach number
12.   Velocity of sound
13.   Propagation of pressure waves


syllabus for FPE (2nd exam-5th sem)

Centrifugal Pumps


1.       Centrifugal pump
2.       Parts of centrifugal pump
3.       Types of impeller
4.       Submersible pump
5.       Single stage and multi stage pump
6.       Priming and cavitation on pump
7.       Working of centrifugal pump
8.       Heads
9.       Efficiency
10.   Velocity triangle
11.   Specific speed model analysis (Assignment-2)
12.   Characteristic curves of centrifugal pump
13.   Numerical

Sunday, September 2, 2012

syllabus for IME (2nd exam-5th sem)


gantt chart
CPM
Network Analysis
PERT
JOhnson method for network analysis for (n) machine and (n) processes
productivity:
Importance of productivity
Means of increasing productivity
Improving productivity
Self study topics:
process selection
machine selection
line balancing and its numericals